Accelerating efficiency: How our on site team saved a luxury automaker €3.4M

Published On: July 14th, 2026

€3.4M

Saved

22%

Reduction in fastener variant

When a luxury automaker needed to hit ambitious KPIs and tight launch deadlines, they turned to Optimas International for on-site, expert support. By embedding our team directly into their operation, we helped streamline engineering decisions and cut fastener variants by 22%, unlocking major cost savings across every vehicle produced.

Situation

Launching a new model meant meeting a demanding set of performance targets. The customer needed deep technical insight, full visibility during the design phase and a partner capable of driving improvements from day one.

Solution

To deliver immediate value, Optimas International deployed local engineering specialists directly on‑site at the customer’s production facility. This enabled a weekly engineering forum that accelerated collaboration and decision‑making. Within the first month, our experts completed 55 targeted technical consultations, identifying opportunities to simplify, standardise and optimise.

A cross‑functional group then built a curated Preferred Parts List, giving engineers a clear, cost‑effective fastener selection for every new design and BOM update. To support rapid adoption, we also developed a 24/7 image‑driven fastener database accessible through the customer’s internal network, ensuring engineers could quickly identify and select approved components.

Result

Optimas International delivered cost savings of €20 per vehicle, totalling more than €3.4 million in total savings – double the customer’s original target.

Beyond the financial impact, the Preferred Parts list, always‑available fastener database and weekly engineering forums transformed internal collaboration and strengthened alignment across all engineering departments.

Unearthing cost and performance efficiencies in excavator design
Tailored Solutions: Power Production and Improved Efficiency