Complete grouting around the tunnel lining helps reduce the risk of ground movement and surface settlement. This is particularly important on urban tunnelling projects, where movement above the tunnel can affect nearby buildings, roads and other infrastructure.
Our grouting and lifting systems can support system selection based on factors such as segment weight, ground conditions and the chosen grouting method, with systems designed to accommodate both mortar and pea gravel grouting. Integrated lifting points also help make the handling and positioning of tunnel segments safer and more controlled.